Stakeholder Interaction Log

Milestone 1: Sprint 1 — Owner: Ndumiso Skhosana — Compiled 25 Aug 2026

Milestone 2: Sprint 2 — Compiled 15 Sep 2026

:::info Rubric target — Stakeholder Interaction (10%) Advanced (80–100%): "Great stakeholder interaction, all requirements discussed." This document evidences five client meetings across two sprints — three in Sprint 1 (10, 17, 25 Aug) and two in Sprint 2 (10 and 13 Sep). Each has dated decisions, direct requirement discussion, and demonstrable follow-through into next steps — not a single check-in. :::

1. Meeting summary​

DateTypeFormatKey focus
10 Aug 2026Client meetingRecorded, timestampedArchitecture mandate, repo access, dev workflow, deployment, auth strategy
17 Aug 2026Client meetingRecorded, timestampedSprint 1 deliverables, CI/CD status, accessibility requirements, code quality standards
25 Aug 2026Client meetingInternal notesMS1 task ownership assigned across group for documentation deliverables

2. Requirements discussed with the client​

Pulled directly from meeting transcripts, mapped against the course's Key Requirements of All Projects and the tutor-management feature brief — demonstrating requirements were actually walked through with the client, not assumed.

2.1 Architecture & non-monolithic split​

  • Client mandated client-server architecture with strict frontend/backend separation, explicitly warning against frameworks that bundle both layers (10 Aug, 00:04:28).
  • Recommended stack: React frontend, ExpressJS backend — confirmed and reaffirmed in the 17 Aug follow-up (00:00:03).

2.2 API design​

  • Client required hand-written REST APIs, explicitly prohibiting auto-generated CRUD from tools like Firebase/Supabase (10 Aug, 00:08:30).
  • Controller-based architecture mandated — a dedicated folder for request-handling logic, to keep application logic explicit and owned by the team.

2.3 Authentication​

  • Client confirmed Firebase (or Supabase) as the authentication approach, supporting email/password and Google sign-in (10 Aug, 00:15:37).
  • Explicit requirement that authentication rely on an established library rather than a custom-built system — consistent with the course's Key Requirements.

2.4 Deployment​

  • Split hosting strategy agreed: Vercel for frontend, Azure for backend/database, to isolate issues between layers (10 Aug, 00:12:35).
  • Interim requirement: deploy a placeholder page to both hosts by end of week, to demonstrate environment setup before feature work begins.
  • 17 Aug follow-up confirmed a service is live on Azure; CD workflow flagged as still incomplete and tracked as an open item (00:06:48).

2.5 Version control & review process​

  • Feature-branch workflow mandated: every change developed on its own branch (10 Aug, 00:07:14).
  • Two-approval requirement for all pull requests before merge, specifically to ensure equal participation across all 6 members (10 Aug, 00:07:14–00:12:35).
  • 17 Aug meeting escalated this into a concrete review method: pulling branches locally and testing before approval, rather than reviewing on GitHub/Gitea alone (00:44:36).
  • Agreed policy: stale or problematic pull requests requiring major fixes are closed and reopened fresh, rather than left inactive — discussed directly in response to a real pull request during the 17 Aug meeting (00:41:00–00:48:22).

2.6 Testing standards​

  • Client raised test-driven development directly and questioned whether trivial tests were being used to satisfy requirements (17 Aug, 00:42:31).
  • Team and client agreed: trivial/placeholder tests are insufficient — pull requests must include substantive tests tied to real functionality (e.g. email validation) before merge (17 Aug, 00:43:35).

2.7 Accessibility & responsiveness​

  • Client explicitly required mobile responsiveness and accessibility — the application must adapt gracefully across screen sizes without removing functionality (17 Aug, 00:18:28, 00:21:35).

2.8 Grading structure & Sprint 1 expectations​

  • Client clarified milestones account for 70% of the total project grade, and that tutors (not the lecturer) mark sprints and milestones (17 Aug, 00:02:59, 00:24:30).
  • Client confirmed the Sprint 1 deadline (25 Aug) and committed to providing a specific demonstration checklist by the following Wednesday (17 Aug, 00:09:59).
  • Client set a concrete Sprint 1 demo requirement: a functional login/sign-up flow must be shown live at the sprint meeting (17 Aug, 00:08:06).

2.9 External API integration & documentation​

  • Potential external API integration discussed as a requirement to fulfil (17 Aug, 00:19:55) — specific service still to be finalised by the team.
  • Client confirmed documentation is correctly deployed via GitHub Pages, satisfying the course's public documentation site requirement.

2.10 Technical implementation decisions​

  • Team proposed and the group aligned on an async error-handling wrapper to replace repetitive try-catch blocks across asynchronous functions, discussed and debated for trade-offs before adoption, in line with the team's agile/iterative approach (17 Aug, 00:49:26–00:53:03).

3. Decisions log​

Formal decisions reached and confirmed in each meeting, in the order discussed.

DateDecisionRationale
10 AugClient-server architecture mandatedAvoid monolithic frameworks; strict frontend/backend separation
10 AugFeature branching + 2-approval PR policyEnsure equal participation across all 6 members
10 AugHand-written REST APIs onlyNo auto-generated CRUD from DB tools
10 AugController folder structure requiredExplicit, owned application logic
10 AugVercel (frontend) + Azure (backend/DB)Isolate issues between hosting layers
10 AugFirebase/Supabase for authEstablished library; email/password + Google sign-in
10 AugInstructor added as read-only repo memberClient/marker visibility into progress
17 AugMobile responsiveness & accessibility mandatedApplication must work across devices and for users with disabilities
17 AugStale/problematic PRs closed and reopened freshAvoid inactive PRs blocking progress
17 AugAsync-catch wrapper adopted for error handlingCleaner code, less repetitive try-catch
17 AugSubstantive tests required, trivial tests rejectedReal code-quality standard, not box-ticking
17 AugLocal branch pull + test required before PR approvalVerify deployment/integration works before merge

4. Assigned tasks arising from client meetings​

Action items directly attributable to stakeholder discussion, drawn from both meeting records plus the 25 Aug task-ownership meeting.

4.1 From 10 Aug meeting​

OwnerTask
The groupAdd instructor to organisation/repository with read-only access
The groupDecouple architecture — build separate frontend and backend layers
The groupImplement feature-branch workflow for every change
The groupEnforce 2-approval requirement on all pull requests
The groupDevelop hand-written REST APIs; no auto-generated DB services
The groupStructure request-handling logic into a dedicated controllers folder
The groupDeploy frontend to Vercel, backend to Azure
The groupDeploy placeholder page to both hosts by end of week
The groupPresent initialised environment at the next meeting (Fri–Mon)

4.2 From 17 Aug meeting​

OwnerTask
Glann Mulaudzi (client)Send list of specific Sprint 1 demonstration requirements
The groupImplement responsiveness — mobile and laptop-friendly layout
The groupPrepare Milestone 2 requirements list and begin implementation
Kgaogelo GFinish remaining missing API endpoints
Kgaogelo GClose current PR and open a new one with fixes incorporated
Nhlamulo MabuzaReview new PR changes and provide approval feedback
Ndumiso SkhosanaResolve file conflict in PR for target-branch compatibility
Ndumiso SkhosanaAlign current PR with main; validate email function against main's implementation
The groupReview pending PR to allow merge into main
Ndumiso SkhosanaDistribute meeting minutes via group chat / Google space

4.3 From 25 Aug meeting — MS1 documentation ownership​

Client requested individual ownership of each MS1 documentation deliverable, assigned as follows:

OwnerDeliverable
MogomotsiProject Methodology
KG (Kgaogelo)Initial Design and Dev Plan
TlhalefoTech Stack
NdumisoStakeholder Interactions (this document)
NduvhoFunctional Requirements
NhlamuloOur own meetings (internal team meeting minutes)

5. Evidence of follow-through​

The rubric rewards not just discussion but integration — showing the client's input was actually acted on, not just recorded.

  • Architecture mandate (10 Aug) → confirmed live and reaffirmed in the 17 Aug meeting, with a working Azure service already deployed by that point.
  • PR review concerns raised generally (10 Aug) → became a concrete local-pull-and-test policy after being tested against a real conflicting PR in the 17 Aug meeting.
  • Testing standard raised (17 Aug) → directly resulted in an agreed policy to reject trivial tests and require substantive coverage, with real examples (email validation) cited.
  • Client's Sprint 1 demo requirement (functional login/sign-up) is tracked as a concrete, checkable deliverable rather than a vague expectation.

6. Open items carried forward​

  • CD (continuous deployment) portion of the pipeline still requires configuration — CI functions correctly, but full CD is not yet complete (flagged 17 Aug).
  • External API integration target still to be finalised by the team.
  • Client's detailed Sprint 1 demonstration checklist — due by Wednesday per the 17 Aug meeting — to be confirmed received and actioned.

Sprint 2 added two further client meetings — a requirements and status meeting on 10 Sep 2026, and a four-hour live review session on 13 Sep 2026. Both were recorded sessions with auto-generated (Gemini) meeting notes that the team reviewed; the full notes are archived as the reference documents for everything below.

:::info Sprint 2 reference documents — full meeting notes

:::

7. Sprint 2 meeting summary​

DateTypeFormatKey focus
10 Sep 2026Client meetingRecorded, timestamped (28 min)Availability & timetable entry, notification system, database migration, 90% coverage policy, API testing & deployment, user-feedback evidence, third-party code documentation, volunteering & timesheet requirements
13 Sep 2026Client review & working sessionRecorded, timestamped (4 h 8 min)End-to-end live walkthrough of every role view, timesheet approval workflow, volunteering & overflow scope, PR merging strategy, deployment, documentation-site requirements

8. Requirements discussed with the client (Sprint 2)​

As with Sprint 1, pulled directly from the meeting records, in the order discussed.

8.1 Availability & timetable entry​

  • Applicants enter their weekly availability manually through the calendar for now — enough to stop a tutor being recommended for a course that clashes with their lectures; PDF timetable import is planned future work (10 Sep, 00:00:00–00:01:04).
  • Client questioned the reliability of unverified manual availability (e.g. exam clashes); the team explained the system produces suggestions and organisers retain final override authority — accepted, with timetable import acknowledged as an advanced future feature (13 Sep, 00:28:39–00:33:54).
  • The four role views were confirmed as admin, tutor, student, and lecturer (10 Sep, 00:19:12); the organiser assignment interface was additionally demonstrated live on 13 Sep (00:38:05).

8.2 Notifications & session attendance​

  • Email notification to a tutor when they are assigned to a course is live (10 Sep, 00:02:37) and was demonstrated with the organiser assignment interface, including an "auto" action that selects the top candidates by marks (13 Sep, 00:38:05–00:40:47).
  • A QR-code digital register for session sign-in/sign-out — mirroring the university's tutorial attendance system — is planned as a future phase (10 Sep, 00:02:37); the client later suggested a secret verification code for event attendance to replace manual supervisor sign-offs (13 Sep, 01:49:39).
  • During the assignment demo, the client flagged the risk of accidental clicks sending assignment-removal emails; the team agreed to add a confirmation prompt before saving assignment changes (13 Sep, 00:39:42).

8.3 Testing standards & API testing​

  • 90% unit test coverage is now required on every pull request before it can be merged, enforced at review time (10 Sep, 00:05:03).
  • API testing is required for Milestone 2: every endpoint must be verified to return the expected status codes and response structures, with parameters as defined — the client recommended Postman and Newman (10 Sep, 00:06:23–00:09:55).
  • The testing procedure itself must be documented on the documentation site, with screenshots of Postman requests as evidence (13 Sep, 00:52:53–00:57:54).

8.4 API deployment​

  • The API must be deployed so third parties can use it — with permissions, and documentation of what each endpoint expects and returns — the client suggested Render or Railway; the team added the requirement to its issue tracker (10 Sep, 00:09:55–00:11:32).
  • Where API documentation is presented as an interactive endpoint listing (Swagger-style), the client expressed a preference for that format (13 Sep, 00:52:53).

8.5 User feedback evidence​

  • Feedback collection requires evidence — a form (e.g. Google Forms) plus analytics showing how many people responded, with a target of roughly 10 responses, and documentation showing the feedback was collected and then acted on (10 Sep, 00:11:32–00:16:17).
  • The client confirmed the feedback does not need to come from live external users at this stage — the team may submit the entries itself, provided the evidence trail (the form and its response data) is preserved and shows follow-through (10 Sep, 00:14:55).
  • Reaffirmed on 13 Sep: a Google Form is to be created, its responses summarised on the documentation site, and used to justify improvements (00:57:54–01:00:36).

8.6 Third-party code documentation​

  • Any third-party code used (e.g. Firebase) must be documented with a clear motivation for why external code was chosen over writing our own (10 Sep, 00:16:17).

8.7 Volunteering & overflow work​

  • The client identified the volunteering feature as missing: an organiser posts a session shortage, students volunteer, and the organiser approves the requests (10 Sep, 00:19:12–00:24:49).
  • Scope aligned on 13 Sep: overflow work covers administrative tasks, marking, and invigilation when tutor staffing is insufficient, and volunteers are existing tutors stepping in during overflow — not a separate user group (02:13:01–02:31:40).
  • The client questioned why users must apply to volunteer before viewing opportunities; the team defended filtering candidates by scheduling criteria to avoid emailing roughly 300 students when only a few positions are needed — the client accepted the design provided the team can defend it under scrutiny (13 Sep, 00:15:29–00:25:54).
  • The excuses feature will track how many tutors have excused themselves from a session, so a shift can be opened for volunteering once a threshold is exceeded (13 Sep, 02:35:18).

8.8 Timesheets, approvals & signatures​

  • The timesheet feature is required, including requesting signatures from authorisers, with a notification to the person responsible for signing (10 Sep, 00:20:36).
  • The full workflow was demonstrated live (13 Sep, 01:50:47–01:55:31): a lecturer creates a course event, the allocated tutor claims it into a timesheet, entries and titles update in real time, submission locks the timesheet against edits, and a supervising lecturer approves or rejects it — rejection by any single supervisor rejects the whole timesheet.
  • The signature requirement was debated (13 Sep, 01:56:41–02:02:23): although the web app tracks approvals digitally, payroll operates outside the system and still needs a supervisor's physical signature on the PDF timesheet — the team concluded signature requirements must align with payroll's operational needs. Approved timesheets export as a correctly populated PDF for exactly this purpose (demonstrated 01:59:03).

8.9 Course applications & governance​

  • The client ruled that lecturers must not independently open applications and dictate tutor numbers without organiser review; the team committed to adding a pending-review status and the ability to manually close a course's application process (13 Sep, 01:31:45–01:33:16).
  • Lecturers specify the maximum weekly hours required for their courses (13 Sep, 00:48:55).
  • Course applications are filtered by the applicant's availability — opportunities only appear when the timetable matches — and an applicant's slot selection locks while the application is pending, preventing scheduling inconsistencies (13 Sep, 01:34:38–01:37:12).
  • The claimable-hours cap is enforced at application time: a second course that would push an applicant over the weekly limit is blocked with an explanatory warning — the client reviewed and confirmed the validation logic (13 Sep, 01:43:26–01:44:54).

8.10 System configuration & payroll​

  • Organiser-managed, system-wide settings drive the claim rules: the maximum claimable hours and the event claim window (demonstrated with test values of 3 hours and one month), and hourly pay rates by year of study feed the automatic payout calculation on timesheets (13 Sep, 01:08:50–01:14:36).
  • An uploaded PDF payroll template is used to generate the finalised timesheet exports (13 Sep, 01:15:32).
  • The client critiqued the "Settings" label for organisation-wide standards (it suggests personal profile management); a rename was agreed for later (13 Sep, 01:11:21–01:12:32).
  • The client suggested an onboarding tutorial guide for first-time users, acknowledged as a valid future addition (13 Sep, 00:51:05).

8.11 Infrastructure & deployment​

  • The database was migrated to a new Azure server after the previous account's free trial expired (attributed to hosting several projects on one server); the new database is live (10 Sep, 00:03:51).
  • The live database was verified working on 13 Sep; local databases must be deleted and the app restarted to reconnect, and dependencies were downgraded for compatibility with the stable Node 22 runtime (13 Sep).
  • Frontend deployment to Vercel was in progress: the workflow had a build step but no deploy step, and required the project ID and token secrets (13 Sep, 02:50:33–02:53:47).
  • Frontend error handling was called out: login failures were silent because only 200-status responses were handled, while the backend already returns standard 403/404 codes — flagged for fixing (13 Sep, 00:06:57–00:08:09).

8.12 Review & merging strategy​

  • A backlog of 10–11 pull requests with merge conflicts and slow approvals led to a paired-merging agreement: each PR author pairs with a designated reviewer, briefs them directly, and merges — clearing the backlog faster than the general approval queue (13 Sep, 02:05:35–02:07:27).
  • Redundant pull requests were closed and working environments re-synchronised with main (13 Sep, 02:16:02–02:18:49).

9. Sprint 2 decisions log​

DateDecisionRationale
10 SepManual weekly calendar entry for availability (PDF import later)Unblocks availability-based recommendation now; timetable parsing is future work
10 Sep90% unit test coverage required on every merged PRCode-quality standard for Milestone 2, enforced at review
10 SepAPI testing (Postman/Newman) required for M2Validate endpoints, status codes, and response structures
10 SepAPI to be deployed with permissions and documentationThird-party accessibility (Render/Railway suggested)
10 SepUser feedback via form, ~10 responses, with evidenceFeedback must demonstrably drive improvements
10 SepThird-party code documented with motivatione.g. Firebase — why external code instead of our own
13 SepConfirmation prompt before saving assignment changesPrevent accidental clicks triggering removal emails
13 SepLecturers specify max weekly hours per courseClaimable-hours control at course level
13 SepTesting section on the documentation site (Postman + screenshots)Rubric requires extensive testing documentation
13 SepUser feedback and third-party code documented on the docs siteCentral, public evidence trail
13 SepPaired merging adopted for the PR backlogClear 10–11 conflicted PRs faster; author briefs a reviewer directly
13 SepOverflow work = administrative tasks, marking, invigilationStaffing-shortage scope; volunteers are existing tutors, not a separate group
13 SepTimesheet signature requirements follow payroll's needsPayroll works from the PDF timesheet with a physical signature
13 SepOrganiser review required before course applications openLecturers cannot unilaterally launch applications; pending-review status to be added

10. Assigned tasks arising from Sprint 2 meetings​

10.1 From 10 Sep meeting​

OwnerTask
The groupDeploy the API to a hosting platform, with documentation and access permissions
Glann Mulaudzi (client)Research API-testing methods and share them with the team
Kgaogelo GDevelop functionality to process uploaded PDF timetables
The groupCreate a questionnaire to record user encounters and feedback; collect responses from at least 10 individuals
The groupUpdate technical documentation with database structure and schema details
The groupCompile documentation for all used third-party code, including the motivation for its integration
The groupImplement the timesheet feature, including requesting signatures with notifications
The groupImplement the volunteer system — organisers post session shortages, students volunteer
Kgaogelo G, MuhammadAdd the API deployment requirement to the issues list
The groupConvene on Sunday for a project status review

10.2 From 13 Sep meeting​

OwnerTask
The groupDelete local databases and restart the application to connect to the live database
Kgaogelo GFix the availability feature that keeps prompting for input after saving
Mogomotsi MotomaAdd a confirmation prompt before the save operation in the assignment module
Ndumiso Skhosana → Mogomotsi MotomaComplete and merge the excuses feature branch (ownership handed over during the meeting)
Kgaogelo GReview the excuses feature implementation
Mogomotsi MotomaRepair the errors identified in the excuses feature codebase
Tlhale SebaengResolve database migration and schema synchronisation issues across branches
Tlhale SebaengRename the settings tab and move the logout functionality
Tlhale SebaengFix the save button triggering both event-claim fields simultaneously
Tlhale SebaengImplement approval of task-assignment numbers for module capacity compliance
Tlhale SebaengAdd the ability to manually terminate a course's application process
Tlhale SebaengDisplay time slots as start and end times only
Tlhale SebaengEnable lecturers to approve timesheets as tutors submit them
Tlhale SebaengAlign the timesheet signature field with payroll requirements
Tlhale SebaengImplement the overflow-work feature (administrative tasks, marking, invigilation)
Tlhale SebaengResolve merge conflicts across open pull requests
Nduvho MulaudziUpdate the live database with the latest schema changes
Nduvho MulaudziConfigure the frontend deployment secrets (Vercel project ID and token)
Nduvho MulaudziInvestigate and resolve the database issues preventing user logins
Mogomotsi MotomaDebug the unauthorised-access errors occurring on the site
Ndumiso SkhosanaCreate the user-feedback Google form and share it with the team
The groupAdd a testing section to the documentation site, including Postman screenshots
The groupIncorporate the collected feedback responses into the project documentation
The groupAudit the application against the rubric for missing features
Nhlamulo MabuzaDraft the project documentation, including testing details and instructions
Kgaogelo GAdd comments to the codebase to improve readability
Ndumiso SkhosanaDistribute the meeting minutes to the group chat

11. Evidence of follow-through (Sprint 2)​

The Sprint 2 requirements moved into the product quickly — the highlights below are cross-referenced where they are documented in depth:

  • Email notifications (10 Sep, live; 13 Sep, demonstrated) → the notifier in backend/email/notifier.js sends assignment-added/removed and timesheet-approved/rejected emails via Resend, with every attempt audited in EmailLog and duplicate-send prevention; the test suite asserts the notifier fires without ever hitting Resend (see Testing).
  • Timesheet feature (10 Sep requirement; 13 Sep live demo) → merged as PR #58 ("Fully implemented timesheet workflow"): the full create, submit, approve/reject, and PDF-export flow in backend/routes/timesheets.js, with colour-coded status badges and re-editable rejected timesheets in the frontend.
  • 90% coverage / substantive-tests policy (10 Sep) → the backend suite has since grown from 33 tests across 4 suites to 74 across 6, adding onboarding, claim-rules, and allocation coverage (see Testing).
  • User feedback with evidence (10 Sep, target of 10 responses) → the Google Form went out on 14 Sep and collected 15 responses; the raw responses (archived PDF and live sheet), trust-rating breakdown, themes, and the mapping of every request to what has since been implemented are documented on the Testing page.
  • Database documentation (10 Sep) → the Database Schema page matches the current schema.prisma, with the ER diagram and modelling notes.
  • Third-party code documentation (10 Sep) → the Third-Party Code page documents each external dependency and the motivation for its use.
  • Testing documentation (13 Sep) → the Testing page documents the feedback process, the automated suites, CI enforcement, and the team's policy around tests (Postman screenshots still to be added).
  • Claimable-hours cap and system settings (13 Sep demo) → organiser-managed SystemSetting values with the 31-day sliding-window cap enforced in backend/utils/claimRules.js and unit-tested in claimRules.test.js.
  • Availability-filtered applications (13 Sep demo) → the onboarding controller only offers courses whose session slots fit the applicant's availability and rejects clashing applications — both rules under test in onboardingController.test.js.
  • Follow-through between the two meetings → the status review agreed for Sunday at the 10 Sep meeting was held on schedule: the 13 Sep session is that meeting, opened against the 10 Sep action items.
  • Infrastructure (10 Sep migration; 13 Sep verification) → the migrated Azure SQL database is live and was verified working during the 13 Sep session; the Vercel project for the frontend is linked in the repository, with deployment in progress by the end of that meeting.

12. Open items carried forward (Sprint 2)​

  • API deployment for third-party access (Render/Railway), with permissions and endpoint documentation — still open.
  • Postman/Newman API testing with screenshots on the documentation site — still open (the suites and policy are documented; the Postman evidence is not yet added).
  • Excuses feature — schema support is on main (Session.excuseReason); the feature branch is being completed and merged (Mogomotsi Motoma).
  • Save-confirmation prompt in the assignment module — agreed, not yet implemented.
  • Organiser pending-review status for lecturer-initiated course applications, and manual application closing — committed to on 13 Sep.
  • QR-code / secret-code attendance verification for sessions — planned future phase.
  • PDF timetable import — planned future work.
  • Renaming the "Settings" tab and relocating logout — agreed for later.
  • Quality-of-experience improvements raised in the user-feedback round (confirmation toasts, status visibility, warning specificity, batch actions) — tracked with the feedback mapping on the Testing page.